top of page

Kearl MSF South

Summary
Size : 87,090 FT

Wall Type : Insulated Metal Panel (R34)

Roof System : Standing Seam (R40)

In Early Powerhouse was selected by Graham Industrial Construction to Design, Supply, and Install the Pre-Engineered Buildings as part of this project. This new Industrial facility will replace the existing mine mobile equipment maintenance and service facility (MSF). This facility will support mining maintenance, administration, warehousing, support maintenance equipment bays, and a separate Heavy Vehicle Wash bay facility.

IMG-3754.JPG
WASHBAY_2 - Photo_edited.jpg
IMG-4446.JPG
IMG-3389.JPG
bottom of page